Contract library written for how you actually build

A shelf of finished contracts — three build agreements (kit supplier, turnkey builder, design-build with subs), a change order, a supply agreement with your yard and a crew & sub agreement — that you copy and make your own.

The operating system built exclusively for post-frame and barndominium builders.

The short answer

Where do I find a good pole barn contract template?

Start from a finished pole barn contract template written for how you build (kit supplier, turnkey builder, or design-build with subs), not a remodeling form. Ours holds six: three build agreements, a change order, a supply agreement with your yard and a crew and sub agreement, each with a note on who carries the warranty and when money is due. Copy one, make it yours, and have your attorney review it.

Why it works
  • Gaps in the paperwork are where disputes start. In Arcadis's 2025 report, errors and omissions in contract documents were the top cause of construction disputes in North America (large-project data, so treat it as direction, not a post-frame figure). Arcadis, 2025 ↗
  • Post-frame work has its own unknowns that a generic form never mentions. The Pole Barn Guru advises getting every agreement in writing up front and listing exclusions, noting that "digging the holes is always an unknown." Hansen Pole Buildings, 2013 ↗
  • Changes need their own paper. California's contractor board says changes to a home improvement contract need a signed, written change order before the work, which is why a change order belongs on the shelf beside the build agreement. California CSLB ↗
  • Vague terms get filled in by each side differently. Babcock and Loewenstein found people judge what's reasonable in a self-serving way, and that this bias drives standoffs, so a finished contract beats an outline you fill in under pressure. Babcock & Loewenstein, 1997 ↗
What it is

Each one is a finished contract, not an outline, tagged with the way of working it was written for and a plain note on who carries the warranty and when money is due. Pick one and you get your own copy to edit however you like. A preview shows it filled with sample numbers, so you read it the way a customer will. Your copies then sit by kind — build agreements, change orders, material supply, workers & contractors — each with its version, its attorney-review state and which one is the default. We work exclusively with post-frame and barndominium builders, so the shelf holds contracts for kit suppliers, turnkey pole barn builders and barndo design-build, not kitchen remodels.

Also called: contract templates · starting point contracts · contract presets · sample construction contract

See it, piece by piece
01

A shelf of finished contracts, not outlines

Six complete agreements in four kinds: three build agreements, each written for a different way of running a building business, plus a change order, a supply agreement with your yard and a work agreement for crews and subs. Not clause fragments to assemble — whole documents you copy and make your own.

Contract Template Library
Contract Template Library
Pick a starting point that matches your business model. You can edit the body afterward.
×
⚠ Templates are starting points, not legal advice. Construction contracts vary by state (mechanic’s lien notices, prompt-pay laws, licensing disclosures, etc.). Have the template reviewed by a licensed attorney in your jurisdiction before using it with customers.
Material Supplier + Installation CoordinatorMaterial Supplier
You sell the building kit and coordinate a third-party crew. You don't self-perform construction labor.
Lower liability profile. Customer pays 100% materials up front; labor is paid in stages to the installer through you. Workmanship warranty flows up from the installer.
General Contractor — TurnkeyGeneral Contractor
You're the GC and self-perform construction with employees. Single-point responsibility.
Higher liability profile. Builder carries own GL + workers' comp and provides own workmanship warranty. Payment is typically progress-based (deposit / rough-in / dry-in / final).
Design-Build with SubcontractorsDesign-Build
You design AND build, using qualified subs for specialty trades (electrical, plumbing, HVAC).
Hybrid liability profile. Builder is GC of record and warrants own workmanship; subcontractor workmanship flows up via subcontract warranties.
Change OrderGeneral Contractor
A signed change to a build already under contract.
Deliberately short — the Project Agreement carries the terms. It insists on exactly what is changing, what it costs, and what it does to the schedule.
Material Supply AgreementMaterial Supplier
What you agree with the yard or manufacturer supplying the package.
Substitutions, price protection, lead time, who eats freight on a short or damaged load, when title passes, and what is returnable.
Crew & Subcontractor Work AgreementDesign-Build
What a crew or sub signs before they set foot on the site.
Scope and rate, independent-contractor status, the certificate of insurance you need before they start, site and safety rules, and a workmanship warranty.
The library, opened from Start from a template. Switch between card and list, then try Use this template. Real screen · sample data.
Without it

The builder means to sort the contract out properly, so he keeps using the one he inherited from a supplier eight years ago. It says he self-performs work he now subs out, and nobody notices until the sub damages something and the paperwork says the builder is on the hook.

Why we built it

Every builder already has a contract he's unhappy with — what he lacks is an afternoon to fix it. A finished document written for how he actually works turns 'one day I'll sort the contract out' into a job done this week.

02

Each one tagged with how you actually build

Material supplier and installation coordinator if you sell the kit and coordinate a third-party crew. General contractor, turnkey if you self-perform with your own employees. Design-build with subcontractors if you take the job from design through construction with mixed labour. Each card says who carries the warranty and when money is due.

Construction Agreement
Construction Agreement
Review the agreement, then sign at the bottom. Use Print / Save PDF at the top to download a copy anytime.
Ridgeline Post-Frame
Project Agreement · Effective August 26, 2026
Ridgeline Post-Frame — Construction Agreement

This Agreement is entered into on August 26, 2026 between Marla Zimmerman (“Client”) and Ridgeline Post-Frame (“Builder”).

Project Address: 4180 Sawmill Road, Ashland, MO 65010


Part 1 — Estimate & Specifications

ItemAmount
Post-Frame Structure Package$38,420.00
Roofing & Trim$9,865.00
Doors & Windows$6,240.00
Concrete Slab & Footings$12,180.00

Subtotal: $66,705.00
Tax: $4,450.00
Total: $71,155.00

Payment Schedule

  • Deposit at signing: 30% — $21,346.50
  • Material release: 40% — $28,462.00
  • Substantial completion: 30% — $21,346.50
FAILURE OF THIS CONTRACTOR TO PAY THOSE PERSONS SUPPLYING MATERIAL OR SERVICES TO COMPLETE THIS CONTRACT CAN RESULT IN THE FILING OF A MECHANIC’S LIEN ON THE PROPERTY WHICH IS THE SUBJECT OF THIS CONTRACT PURSUANT TO CHAPTER 429, RSMO. TO AVOID THIS RESULT YOU MAY ASK THIS CONTRACTOR FOR “LIEN WAIVERS” FROM ALL PERSONS SUPPLYING MATERIAL OR SERVICES FOR THE WORK DESCRIBED IN THIS CONTRACT.
In the event payment is not made when due, if the default is not cured within 10 days of the due date, then the payment shall bear interest at the rate of 10% per annum from the payment due date until paid.

Part 2 — Client Waiver and Agreement

By applying your initials to each section, you acknowledge that you have read, understood, and accepted the related terms.

1. Materials

We use high-quality materials; however, natural characteristics of wood and concrete may include splits, knots, cracks, warping, mold, or discoloration. These are normal and do not indicate defects. Metal trim, siding, and roofing are handled manually and may show scratches, dings, oil-canning, cutting marks or gaps.

Initialed:

2. Site Preparation

The project site must be level within two (2) inches unless otherwise agreed upon in writing. All obstructions must be removed within twenty (20) feet of all sides of the new structure before construction begins.

Initial:Tap to initial
A finished agreement from one of these models. Real screen · sample data.
Without it

Contract templates online are written for general construction and say nothing about post-frame, kits, or coordinated installers. The builder picks the closest one, edits the obvious bits, and leaves the liability language exactly as it was — which is the part that mattered.

Why we built it

A kit supplier and a turnkey builder carry different risks, and the contract should say so. Picking the one written for your way of working keeps you from quietly accepting liability for work you don't do.

Sound familiar?“don't have a real contract, just a quote and a handshake”
03

Read the whole thing before you take it

Preview shows the entire contract filled with sample numbers, so you read it the way your customer will rather than as a template full of placeholders. Card view for the summaries, list view when you know what you are looking for.

The signed agreement
Leads2Build
Ridgeline Post-Frame
118 Ridge Line Rd, Elkhart, PA 17022 · (717) 555‑0142
CONSTRUCTION AGREEMENT
CHB‑2026‑0184 · 16 May 2026
Between
Ridgeline Post-Frame LLC
Pennsylvania limited liability company
And
Marla J. Zimmerman
4180 Quarry Bend Rd, Millersburg, PA 17061
Part 1
The Project
Building40′ × 60′ × 14′ post-frame shouse
Roof4/12 gable · 29 ga standing seam · Burnished Slate
Walls29 ga ribbed steel · Light Stone · 3′ wainscot in Burnished Slate
Openings(1) 14′ × 12′ overhead · (1) 3′ walk · (4) 4′ × 3′ windows
Foundation6" concrete slab, 24" rebar spacing, frost footer
Additions12′ × 40′ open lean-to, right sidewall
Contract price$91,006.50
Deposit$27,301.95 on signing
Part 2
Client Waiver and Agreement

This waiver ensures that both parties understand the expectations, conditions and limitations of the project. By applying your initials to each section, you acknowledge that you have read, understood and accepted the related terms.

1MaterialsMaterial substitutions of equal or better grade may be made where supply requires it. Colour variation between production runs of steel is inherent and is not a defect.
2Site PreparationThe site must be within four inches of level and accessible to a loaded truck and a lift. Additional excavation, fill or rock removal is billed as a change order.
3LandscapeRuts, compaction and damage to lawn, drives and buried private lines within the working area are an expected consequence of construction and are not restored under this agreement.
4Stamped Plans & PermitsEngineered stamped plans and permit fees are excluded unless itemised in Part 1. The client is responsible for setback, easement and covenant compliance.
5UtilitiesPublic locates are arranged before digging. Private lines — irrigation, invisible fence, yard lighting, septic — must be marked by the client.
6Marketing & Media Use WaiverThe contractor may photograph the completed structure for portfolio and advertising use. The client's name and address are never published.
7Change OrdersNo change to scope, materials or price is effective until a written change order is signed by both parties. Verbal instructions on site are not change orders.
8Contract & Cancellation PolicyDeposits reserve production capacity and material pricing. Cancellation after materials are released is subject to restocking and freight already incurred.
9InsuranceThe contractor carries general liability and workers' compensation. Certificates are available on request. Builder's risk on stored materials is the client's.
10Liability WaiverThe client and their guests enter an active construction site at their own risk. Children and animals must be kept clear of the working area.INITIAL
11Labor ForcePortions of the work may be performed by qualified subcontractors. The contractor remains responsible for the work and for the site.INITIAL
12Building ProcessConstruction is weather-dependent. Schedule dates are estimates made in good faith and are not guarantees of completion.INITIAL
13Construction MethodPost-frame construction with engineered trusses and laminated columns. Structural design conforms to the applicable building code for the jurisdiction.INITIAL
Part 3
Comprehensive Warranty
Labor & Craftsmanship
10-year limited warranty on workmanship from the date of substantial completion.
Materials
Manufacturer warranties pass through to the client in full, including the steel finish warranty.
Lifetime Structural Design
The engineered structural design is warranted for the life of the structure.
Warranty Process
Claims are made in writing. The contractor inspects within fourteen days of notice.
Signatures
Client
Marla J. Zimmerman
Signed 16 May 2026, 8:41pm
Ridgeline Post-Frame LLC
Dale Whitmore, Member
Counter-signed 17 May 2026, 7:12am
Fully executedDownload PDF
The whole contract, filled with sample values. scroll it. Real screen · sample data.
Without it

The builder picks a template from a name and a one-line description, uses it on a live job, and reads it properly for the first time when a customer asks about clause nine.

Why we built it

A builder can only judge a contract he can actually read. Previewing it filled with real numbers, the way the customer will see it, means you choose with confidence instead of discovering clause nine on a live job.

04

It becomes yours the moment you take it

Choosing one copies it into your account and makes it your default. It sits on your shelf under its kind with a version number; press Edit to change any word in the contract builder — blocks and clauses, facts picked by name, no codes to learn. Later changes to our library never reach back and alter what you have.

Settings — Contracts, the copies you keep
Contracts
Every agreement you keep, by kind. Open one to read it the way your customer will; press Edit to change its clauses, initials and signature blocks.
Start from a template
These are starting points, not legal advice. Construction contracts vary by state. Have a licensed attorney in your jurisdiction review a contract before using it with customers.
Build agreements2
The main contract a customer signs for their building. This is the one the customer funnel sends.
Default
16 blocks11 numbered clauses7 ask for initialsSample values shown
Construction Agreement
This Agreement is entered into on October 9, 2026 between Dana & Cole Whitaker (“Client”) and Prairie Ridge Builders (“Builder”) for the building at 2214 County Road 9, Fairview, KS.
3. Payment
Contract Price $148,600.00, paid on the schedule below. …
Change orders1
A signed change to a build already under contract — new scope, its own price, its own effect on the schedule.
Default
Material supply0
What you agree with a yard or manufacturer supplying the package — pricing, lead times, delivery and damage.
No material supply yet.
Create your first one
Workers & contractors1
What a crew or subcontractor signs before they work — scope, rate, insurance and site rules.
Default
Your contracts in settings, by kind. Open a row, or try the ⋯ menu. Real screen · sample data.
Without it

A platform updates its standard agreement, and every builder using it discovers their live contract wording changed without warning. Nobody signed off on the new text and several signed customers are now on a document nobody can reproduce.

Why we built it

Nobody wants their signed contracts to change because a software company edited a template. Copying on take means your wording is yours from the first click — and no update of ours can ever touch it.

Sound familiar?“my contract was written for a different kind of job”
05

The job's facts fill themselves in

The customer's legal name, the build site, the approved price, the payment stages and the lien notice for their state go into your contract as named fields — Project Name, Contract Price, Build Site — picked from a list rather than typed as codes, and they fill themselves in at signing from the approved estimate and their intake form.

Review & Send Contract
Review & Send Contract
Pending — review and send to the customer
×
Customer’s Submitted Details
Click a field or value to drop its placeholder into the contract — it fills in automatically for each customer.
Identity
Legal name:Marla J. Zimmerman
Date of birth:1979-04-11
Mailing Address
Address:812 Willow Bend Ct, Ashland, MO, 65010
Contact Info
Email:marla.zimmerman@demo.invalid
Phone:(717) 555-0162
Property Info
Site address:4180 Sawmill Road, Ashland, MO, 65010
Ownership:owned outright
Source of Funds
Source:CASH
Details:Land sale proceeds
Contract Body (editable before sending)
Switch template…EditPreview
FormatBH•≡1≡
CustomerLegal nameMailing addressEmailPhone
ProjectProject nameJob site addressStart date
EstimateTotal priceMaterialsLaborMarkupPayment schedule
OtherToday's date
# Ridgeline Post-Frame — Construction Agreement This Agreement is entered into on **{{date.today}}** between **{{customer.legal_name}}** ("Client") and **{{builder.company_name}}** ("Builder"). **Project Address:** {{project.address}} --- ## Part 1 — Estimate & Specifications {{estimate.line_items_table}} **Total:** {{estimate.total}} ### Payment Schedule {{estimate.payment_schedule}}
Edits here apply only to this customer’s contract. Markdown is supported — switch to Preview to see the rendered result.
Open customer’s contract pageCopy linkNotify byEmailTextSend ContractCancel
Review & Send, before it goes. Real screen · sample data.
Without it

The estimate says one figure and the contract says another because somebody typed it at the end of a long day. There is now a signed piece of paper for the wrong number and no good way to argue it.

Why we built it

The office shouldn't be retyping figures at the end of a long day. Tokens fill the names, address and money from the job, so the contract and the estimate can't disagree — and nobody has to argue about a typo.

06

The state clause follows the build site

Try it

Missouri and Kansas carry their own statutory wording — Missouri's mechanic's-lien notice, Kansas's notice-of-defect rule; elsewhere the agreement names the state and its lien rights generally. Taken from the build address on the form, not from where your office is.

Governing law, by build-site state
Governing law

Taken from the build-site address on their intake form — not from where your office is.

Build siteAshland, MO
Try a state
XV. Lien Rights and State Notices
Missouri Notice. Failure of Contractor/Supplier to pay those supplying labor or materials may result in mechanic's liens under Missouri law. Client may request lien waivers.
XVI. Governing Law
This Agreement shall be governed by the laws of Missouri. Venue shall be the county where the project is located.
Statutory wording written for Missouri.
The lien-notice and governing-law clauses. Click a state. Real screen · sample data.
Without it

The contract carries the notice for the state the builder lives in, on a job forty miles across the line. It is wrong in a way nobody reads until it matters.

Why we built it

A builder working across a state line shouldn't have to remember whose law applies. The site address picks the clause, so a whole category of mistake disappears without anyone thinking about it.

07

Mark the clauses they must initial

Switch on Ask the customer to initial this clause on any numbered clause and the agreement becomes a contract that takes initials per clause — and the server refuses the signature until every one is there.

Initial each section
Draw your initials once, then tap “Tap to initial” on each section as you read it.2 / 13 initialed
Sign here
Clear
Per-clause initials. Real screen · sample data.
Without it

A dispute turns on whether the customer was told about the allowance. The only evidence is one signature at the end of eleven pages, which proves the document existed and nothing else.

Why we built it

When a dispute turns on one clause, the builder needs proof it was read. Numbering the clauses in the template is what lets the signing page ask for an initial on each — turning a signature into evidence.

Sound familiar?“borrowed a contract off the internet and it doesn't match how I work”
08

Saving makes a version, it does not overwrite

Try it

Every save is a new version. Contracts already signed keep the exact body they were signed on, frozen. You can also switch one job to a different template without touching anyone else's.

Portal doc modal
Build Progress
Invoices (5)
$71,259.00 outstanding
INV-1039 · Materials draw
Ridgeline Post-Frame
118 Ridge Line Rd, Elkhart, PA
INVOICE
Bill To
Marla J. Zimmerman
4180 Quarry Bend Rd, Millersburg, PA 17061
Balance Due$51,360.00
Backdrop click and Escape close this. Your place on the dashboard is kept.
The signed copy, still retrievable. open it. Real screen · sample data.
Without it

The builder improves his contract in March. In August a dispute arises over a job signed in January, and the only version anybody can produce is the current one — which is not the document that was signed.

Why we built it

When a lawyer asks what was agreed in January, you need January's words. Each save keeps a version, so improving your contract in March never erases what a customer actually signed.

09

A record that counsel actually looked at it

Mark your default build agreement reviewed, with the reviewer's name, and the date is stamped beside it — an auditable record. Saving any change to the body resets it, so an edit made after review forces a re-review rather than quietly inheriting the old sign-off.

Settings — Contracts, attorney review
General Contractor — Turnkeyv3 · attorney reviewed · updated Oct 2, 2026Default
Attorney review
Mark this template as reviewed by counsel for an auditable record. Saving any body change automatically resets review status so a post-review edit forces re-review.
Reviewed
Reviewed by Hollis & Price LLP on 10/2/2026
The attorney-review record under your contracts. Press Edit and watch the review clear, then mark it again. Real screen · sample data.
Without it

The contract was reviewed by a lawyer two years and nine edits ago. Everybody still refers to it as the reviewed contract, and nobody can say which parts of it counsel ever saw.

Why we built it

A builder should never believe a paragraph he added last week was checked by his lawyer. The review stamp resets the moment the wording changes, so 'reviewed' always means what it says.

Sound familiar?“need a post frame building contract template”
10

Your crews sign a different document entirely

Try it

The acceptance agreement a crew lead signs when they take a project is its own template with its own placeholders — labour total, project name, today's date — kept well away from the customer-facing library.

Sub agreement editor
Sub Agreement

The acceptance contract your crew leads sign when they take a project. Use your own agreement text — the placeholders below fill in automatically for each project when the lead signs.

Fill-in placeholders
{{labor.amount}} — labor total from the approved estimate (e.g. $11,262.50)
{{project.name}} — project name
{{customer.name}} — customer name
{{date.today}} — today's date
PROJECT ACCEPTANCE AGREEMENT I, the undersigned crew lead, am signing this agreement personally — not on behalf of any other person — and I accept the project assignment described in this document under the following terms: 1. PERSONAL COMMITMENT I personally commit to completing {{project.name}} for {{customer.name}} according to the project plan, schedule, and quality standards established by the company. Walking off the project without prior written authorization from company management is a breach of this agreement. 2. LABOUR The labour figure for this project is {{labor.amount}}, as agreed on {{date.today}}.
Current: version 3
The sub agreement, in settings. Real screen · sample data.
Without it

Crew terms live in a Word file on the office computer, get printed when someone remembers, and are signed by about half the crews. Which crews accepted which terms is a question with no answer.

Why we built it

Sending a crew the customer's contract — or the other way round — is an embarrassment nobody needs. Keeping crew acceptances on their own shelf means the right people sign the right terms, and you can see which crews have.

11

And the customer reads it on their own page

Try it

No attachment, no portal login. The finished agreement sits on their project page with everything else, and stays there after signing.

What They See — Contract

What rides alongside the agreement they sign. Untouched rows follow Settings → Client Portal.

The customer's contract tab. Real screen · sample data.
Without it

The customer asks for a copy of what they signed, usually because a bank wants it. The builder searches sent mail, finds three attachments and cannot tell which was final.

Why we built it

Customers lose emailed PDFs; they don't lose a page they already bookmarked. Leaving the signed agreement on their own page means the bank's request in month eight is answered without a call to you.

How it works
  1. 1In Settings → Client Portal → Contract, press Start from a template.
  2. 2Read each card's business model badge and its paragraph on liability, warranty and payment shape.
  3. 3Preview body shows the whole contract filled with sample values.
  4. 4Choose Use this template and a copy is saved as yours, set as the default for new jobs.
  5. 5Your copy lands under its kind; Edit opens it in the contract builder, and Duplicate makes a variant without touching the default.
  6. 6Anything already signed keeps its own locked copy and is not touched.
Why we built it

Plenty of builders sell six-figure buildings on a quote and a handshake, or on a contract borrowed off the internet that was written for a remodeler. The wording that protects a kit supplier coordinating an independent crew is not the wording that protects a turnkey builder carrying his own workers' comp — and finding that out during a dispute is expensive. So the library ships real contracts, one per way of working, and every one of them says on its face that a lawyer in your state has to read it before you use it.

The problem
  • Builders operating without any written agreement at all
  • Using a turnkey GC contract while actually only supplying a kit and coordinating an installer (or vice versa)
  • Not knowing what a contract for your liability profile should even contain
What you get
A complete, model-appropriate contract in place the same day
Preview shows what the customer will actually read before you commit
Your copy is yours — edit any clause without touching anyone else's
What's inside
Three ways of working, three liability positions

Material supplier and installation coordinator — you sell the kit and line up an independent crew, the workmanship warranty comes up from the installer, materials are paid up front and labour in stages. Turnkey builder — you self-perform with your own people, carry your own liability and workers' comp, and warrant your own workmanship. Design-build with subs — you are the builder of record, your subs' warranties flow up to you, and their insurance is on file before anyone sets foot on site.

Your own contract, loaded as your starting point

Your verbatim legal text becomes a preset in your own library. You duplicate it per building type instead of retyping it.

CONTRACT ENGINE

See contract library written for how you actually build
on one of your own jobs.

Thirty minutes with Keith — your building, your numbers. Bring the job where “don't have a real contract, just a quote and a handshake” — we will show you exactly where that stops.

leads2build.com
Contract Template Library
Contract Template Library
Pick a starting point that matches your business model. You can edit the body afterward.
×
⚠ Templates are starting points, not legal advice. Construction contracts vary by state (mechanic’s lien notices, prompt-pay laws, licensing disclosures, etc.). Have the template reviewed by a licensed attorney in your jurisdiction before using it with customers.
Material Supplier + Installation CoordinatorMaterial Supplier
You sell the building kit and coordinate a third-party crew. You don't self-perform construction labor.
Lower liability profile. Customer pays 100% materials up front; labor is paid in stages to the installer through you. Workmanship warranty flows up from the installer.
General Contractor — TurnkeyGeneral Contractor
You're the GC and self-perform construction with employees. Single-point responsibility.
Higher liability profile. Builder carries own GL + workers' comp and provides own workmanship warranty. Payment is typically progress-based (deposit / rough-in / dry-in / final).
Design-Build with SubcontractorsDesign-Build
You design AND build, using qualified subs for specialty trades (electrical, plumbing, HVAC).
Hybrid liability profile. Builder is GC of record and warrants own workmanship; subcontractor workmanship flows up via subcontract warranties.
Change OrderGeneral Contractor
A signed change to a build already under contract.
Deliberately short — the Project Agreement carries the terms. It insists on exactly what is changing, what it costs, and what it does to the schedule.
Material Supply AgreementMaterial Supplier
What you agree with the yard or manufacturer supplying the package.
Substitutions, price protection, lead time, who eats freight on a short or damaged load, when title passes, and what is returnable.
Crew & Subcontractor Work AgreementDesign-Build
What a crew or sub signs before they set foot on the site.
Scope and rate, independent-contractor status, the certificate of insurance you need before they start, site and safety rules, and a workmanship warranty.