Most construction estimating software is built to measure a set of plans. A pole barn quote usually starts with a phone call and no plans, so Leads2Build has you draw the building in 3D and counts every stick, sheet and screw while you draw.

3D Builder
OrbitWalkInspect
Snap on
1 check · 2 notes
The real screen, drawn from the product’s own design system. Sample data — no customer information appears here.
Miniature 40x60 post-frame shop with a lean-to, half framed, beside its full material package laid out in counted stacks.

What construction estimating software has to do for a post-frame shop

An estimating tool does three jobs: it measures what the job needs, prices those quantities, and turns the result into a proposal a customer can say yes to. Most tools measure from drawings: upload the plans, trace them on screen, and the software counts what you traced. That works when an architect has already drawn the job.

A post-frame quote rarely starts there. It starts with someone on the phone asking what a 40x60 shop with 14-foot eaves, a 12-foot lean-to down one side and two overhead doors will cost. There is no drawing yet, and the posts, trusses, girts, purlins, steel runs, trim and footings still have to come out right.

So in Leads2Build the drawing is the estimate. You size the building in a 3D designer and the material list is counted from that geometry as you go. Nothing is re-entered, so nothing is re-entered wrong.

Where post-frame estimates leak, and a quick test for each

Try each one on any estimating tool, yours included, using a job you've already quoted.

I size it in one place and count the steel in another

The building lives in one tool and the list in a spreadsheet, so every change gets retyped. Test: move the eave from 14 to 16 feet and count the numbers you have to touch.

The porch was estimated by feel

Lean-tos and porches get added last, and their columns, beams and post concrete are the lines most often missing from the order. Test: add a 12-foot lean-to and check that the post count and the yards of concrete both go up.

Wall steel figured as perimeter times eave

That sum is only right for four walls at one height. It misses the gable triangles and any wall split by wainscot. Test: turn wainscot on and look for two wall runs plus a separate gable line.

Lumber went up and every quote is stale

A yard price change should reach every building still being priced, but not a quote a buyer already holds. Test: raise the 2x6 price and see whether the quotes you already sent moved too.

Labour is a guess every time

A per-square-foot rate from three years ago can't see this job's tall eaves, overhead doors or wainscot. Test: take the eave past 14 feet and add an overhead door. If labour doesn't move, it isn't reading the building.

Three PDFs called final

When each revision is a new attachment, nobody is sure which price the customer signed. Test: ask the office which version the customer is reading right now, and time the answer.

From the first phone call to a priced quote

How an estimate runs in Leads2Build.

  1. Draw it while they talk

    Start from a preset and drag width, length, eave and pitch on the building itself. Doors and windows snap to the bays, and a lean-to or porch frames itself into the main structure.

  2. The material list counts itself

    Six sections, framing to fasteners, each line with a quantity, a unit and a note on where the number came from. Lumber is packed into the stock lengths a yard sells, with the waste shown.

  3. It flags what won't build

    More than forty checks run as you draw: a pitch below the panel's minimum slope, a truss span past what a plant will build, a footing above frost depth. Errors stop you; warnings ask.

  4. Price it with your numbers

    Your cost and sell price sit on every material. Labour is read off the building at your crew's rates, and markup can cover the whole job or one section. A line with no price is named, never silently zero.

  5. Freeze it and send one link

    The priced list freezes into a dated estimate. The customer opens one link on your domain: their building in 3D, the price build-up you choose to show, the payment schedule, and Approve & Sign.

A material list you can check, not just trust

The takeoff off a 40x60 at 4/12, trusses 10 feet on centre.

Every line is something a yard sells: 6x6 treated posts in 20-foot stock, 2x6 girts in 16-foot stock, roof panels at their cut length, trim in linear feet, the overhead door, the screws, the post-hole concrete in cubic yards. The note under a lumber line is its working: 92 girts bought at 16 feet to cover 1,404 feet, with 68 feet of drop.

Gable-end steel is its own line, because a gable is a triangle. Change the building and every line moves with it. The list also says what it is not: a design aid, not engineering or a stamped truss package.

Materials
Framing
6x6 solid-sawn post (UC4B treated) (18′ stock)
378 LF consumed · 21×18′ · 0 LF waste · incl. 4′ embedment — UC4B ground-contact treatment is a hard spec for embedded posts
21 pcs
6x6 jamb post (UC4B treated) (18′ stock)
36 LF consumed · 2×18′ · 0 LF waste · 2 laminated 2-ply (span > 9′) — full height, header load path
2 pcs
Nailed jamb (2-ply 2x6 / 4x6) (14′ stock)
134 LF consumed · 10×14′ · 6 LF waste · 8 doubled 2x6 + 2 4x6 — bearing on the splash plank, tied to the header. No embedment, no ground-contact treatment.
10 pcs
2x6 cripple (above headers) (8′ stock)
235.5 LF consumed · 30×8′ · 4.5 LF waste
30 pcs
2x8 door jamb + head jamb (overhead doors) (14′ stock)
39.6 LF consumed · 3×14′ · 2.4 LF waste
3 pcs
2x10 spring anchor pad (SYP #2 or better — NOT SPF) (8′ stock)
2 LF consumed · 1×8′ · 6 LF waste · lagged, never nailed — 4 × 3/8″ × 4″ lags, one near each corner
1 pcs
2x6 wall girt (cut-to-stock)
1240.8 LF consumed · 38×10′ + 116×8′ · 67.2 LF waste
154 pcs
2x8 skirt board (treated) (cut-to-stock)
180.9 LF consumed · 6×10′ + 17×8′ · 15.1 LF waste
23 pcs
2x6 eave strut (cut-to-stock)
200.5 LF consumed · 8×10′ + 16×8′ · 7.5 LF waste
24 pcs
2x4 roof purlin (cut-to-stock)
1447.7 LF consumed · 72×20′ + 24×8′ · 184.3 LF waste
96 pcs
1-ply 2x8 opening header (8′ stock)
22.2 LF consumed · 5×8′ · 17.8 LF waste
5 pcs
2-ply 2x12 opening header (16′ stock)
31.7 LF consumed · 2×16′ · 0.3 LF waste
2 pcs
2x6 window sill (8′ stock)
20.4 LF consumed · 4×8′ · 11.6 LF waste
4 pcs
Truss C40P4 (40′ span, 4/12)
spec-string per SmartBuild convention (C{span}P{pitch}); 4′ o.c. — 2 gable + 14 common · double-Fink (WW) webs, plated both faces (ANSI/TPI 1)
16 pcs
2-ply SYP 2x12 truss carrier (cut-to-stock)
240 LF consumed · 12×16′ + 4×12′ · 0 LF waste · 2-ply, both sidewalls — trusses at 4′ o.c. land between posts at 8′, so they bear on a carrier rather than on the post tops
16 pcs
2x4 bottom-chord bracing (16′ stock)
336 LF consumed · 21×16′ · 0 LF waste · {floor sq ft} × 0.00875 over 2400 sq ft — shop rule, not an engineered layout
21 pcs
2x4 miscellaneous bracing (20′ stock)
378 LF consumed · 21×20′ · 42 LF waste · {floor sq ft} × 0.00875 over 2400 sq ft — shop rule
21 pcs
2x4 X-bracing (20′ stock)
162 LF consumed · 9×20′ · 18 LF waste · {floor sq ft} × 0.0035 — only fires at or above 578 sq ft, as the shop rule does
9 pcs
2x6 corner bracing (20′ stock)
400 LF consumed · 20×20′ · 0 LF waste · flat 20 pieces — the shop's standing corner-bracing allowance
20 pcs
2x6 eave sub-fascia (cut-to-stock)
123.9 LF consumed · 6×16′ + 2×14′ · 0.1 LF waste · carries the eave fascia and the soffit's outer edge
8 pcs
2x6 rake sub-fascia (cut-to-stock)
92.2 LF consumed · 4×16′ + 4×8′ · 3.8 LF waste · carries the rake fascia at the gable overhang
8 pcs
Sheathing
Ribbed steel (exposed fastener) roof panel, 22.1′ length
2 rectangle face(s) @ 36″ coverage · 2745 sq ft (MBCI MasterRib (36″ coverage, ¾″ ribs @ 9″))
42 panels
Roof underlayment / condensation barrier
2745 sq ft + 10% lap
3,020 sqft
Wall steel panel, 11′ length
1851 sq ft net of openings @ 3′ coverage
61 panels
Wall steel panel, 7.4′ length
119 sq ft net of openings @ 3′ coverage
8 panels
Wall steel panel, 7.2′ length
22 sq ft net of openings @ 3′ coverage
1 panels
Wall steel panel, 1.9′ length
27 sq ft net of openings @ 3′ coverage
5 panels
Wall steel panel, 0.6′ length
9 sq ft net of openings @ 3′ coverage
8 panels
Wainscot panel, 3′ height
553 sq ft
69 panels
Wainscot panel, 0.1′ height
1 sq ft
6 panels
Gable-end wall steel (cut to rake)
267 sq ft of gable endwall infill — not a rectangle
27 panels
House wrap — 10′ roll (wall)
2295 sq ft of wall ÷ 211 sq ft per roll (empirical coverage)
11 ea
House wrap — 10′ roll (roof)
2745 sq ft of roof ÷ 211 sq ft per roll (empirical coverage)
14 ea
Trim
Ridge cap
62.1 LF
Rake trim
92.2 LF
Eave trim
123.9 LF
Corner trim
55.9 LF
Door/window trim
127.4 LF
Eave fascia — 5½″ steel fascia/post trim
covers the sub-fascia; separate from the eave drip edge, which both exist on a finished eave
123.9 LF
Rake fascia — 5½″ steel fascia/post trim
the gable-end equivalent of the eave fascia
92.2 LF
Vented aluminium soffit (12″)
123.8 LF of eave soffit as drawn — rake soffit is not modelled yet and is NOT included
123.8 LF
Inside/outside closure strip
matches every eave run of exposed-fastener steel
123.9 LF
Doors & Windows
Garage Door 14′ × 12′
1 ea
Walk-in Door 3′ × 6′-8″
1 ea
Window 4′ × 3′
4 ea
Fasteners
Truss plate (gang-nail, 20 ga galvanized)
pressed into both faces at each truss joint — the connection, not overlapping wood
384 ea
Truss/rafter-to-post uplift tie (H2.5A-class, 18 ga galvanized)
one per truss bearing per post line — uplift path from roof to column
32 ea
1½″ HH panel screw (color-matched)
{sf}×1.8 over 5594 sq ft — platform default; calibrate per builder
10,069 ea
Foundation
Concrete, 18″ dia × 4′ post holes
23 holes — uplift anchorage required on every embedded post
6 yd3
Footing pads, 18″ dia × 6″ concrete
bear below the frost line on undisturbed soil — 2000 psf presumptive bearing; precast "cookie" or poured in the hole
23 ea
Uplift restraint — full-depth concrete collar (as drawn)
the poured backfill above is the restraint; treated blocks bolted to the embedded face are the soil-backfill alternative
23 ea

Design aid, not engineering — this is a purchase-vs-consumed takeoff from the same members the model draws. Stock lengths are yard lengths (no 60′ 2x4s). Factory trusses stay factory trusses. Not a substitute for a licensed design professional, a stamped truss package, or your local building department.

Materials counted off a 40x60 in six sections, with stock length, feet consumed and waste under each lumber line. Real screen · sample data.

Every revision kept, and one of them live

Two versions of the same 40x60, each in its own colour.

The wainscot comes off, the doors change, then they want last week's number back. Every revision is kept as a version with who made it and when. Exactly one is live, and the customer's link always shows that one.

Here version 4 comes out $4,422 higher, and the panel shows where: mostly services, a higher doors-and-windows line, and no wainscot panels. Version 3 stays live until you send the new one. Make an earlier version live and the same link follows. A signed version stays locked until someone deliberately unlocks it, and the unlock is recorded.

Versions — Compare
Versions
Hoover 40 × 60 Equipment Storage
Done
Version 3 → Version 4 → DifferenceChange
v3: $88,926.47v4: $93,348.50
+$4,422.03
more · customer total
Materials$49,360.22 → $49,808.75+$448.53
Services$21,846.00 → $25,546.00+$3,700.00
Markup$8,809.72 → $9,083.22+$273.50
Line items changed
Doors & Windows$8,329.47 → $9,640.00+$1,310.53
Wainscot Panelsgone$862.00 → —−$862.00
Version 4Latest
Aug 24, 2026 2:14 PM · Dale Whitmore
$93,348.50
customer total
Version 3LiveSent
Aug 21, 2026 9:02 AM · Dale Whitmore
$88,926.47
customer total
v2
Version 2SentFirst sent
Aug 12, 2026 4:37 PM · Marcus Feld
$84,110.00
customer total
Versions 3 and 4 compared: services up, doors and windows up, wainscot panels gone, and version 3 still the one the customer sees. Real screen · sample data.

Which kind of estimating tool fits which shop

Estimating tools split by where the quantities come from. Each kind is good at the job it was built for.

What mattersLeads2BuildPlan-takeoff and cost-database tools
Where quantities come fromA 3D model of the building, drawn during the call. No plans needed.Measured from plans or PDFs you upload, as in STACK and PlanSwift. The right fit when a drawing set exists.
Trades coveredPost-frame buildings: shops, pole barns, barndominiums, arenas, equipment storage.Many trades. PlanSwift covers concrete, framing, drywall, flooring, electrical, plumbing and HVAC.
Speeding up the measuringNothing to trace. Quantities come from the members the model draws.AI-assisted takeoff on plans, such as PlanSwift's Takeoff BOOST, which handles measuring, counting and scaling.
Cost dataYour cost and sell price per material, starting from a book calibrated on 258 real post-frame estimates.Large reference data. Clear Estimates carries locally adjusted costs for 15,000+ line items across 400 US areas; Buildxact offers real-time dealer pricing.
What the customer getsA link on your domain with their building in 3D, the price build-up you choose to show, and Approve & Sign.Branded proposals with itemised costs and your logo, as in Clear Estimates and Buildxact.
Getting startedA demo on one of your buildings. The price book arrives calibrated and you edit it to your yard.STACK offers a free version; Clear Estimates plans start at $59 a month.

Details for other tools as of September 2026, from each company's own website. If you bid many trades from drawing sets, a plan-takeoff tool is the better fit.

Already estimating in SmartBuild

If your shop has years of jobs in SmartBuild, there is no reason to walk away from them. Leads2Build connects to SmartBuild as a partner, not a replacement:

  • Connect your own SmartBuild login in settings, and your projects, estimates and job details show up inside Leads2Build.
  • Pull a job's drawings and documents, and share its 3D viewer link with the customer.
  • Choose where new estimates start: SmartBuild or the built-in 3D designer. Switching only changes which screen opens; your SmartBuild jobs stay put, and you can switch back any time.

Open a SmartBuild job and its size, roof, door counts and contact details come across, so the proposal and the job record start from the same numbers.

Go deeper

LEAD · QUOTE · SIGN · INVOICE · BUILD

Bring a building
you've already quoted

Tell us the size, doors and lean-to of a job you priced recently. We'll model it live, and you can check the material list against what you ordered.

leads2build.com
A post-frame barndominium at dusk, warm light in every window
The great room of a finished barndominium — exposed timber trusses, a stone fireplace and a wall of windows
Leads2BuildBUILDER OPERATING SYSTEM
A finished post-frame shop with charcoal steel siding and two overhead doors
Leads2BuildBUILDER OPERATING SYSTEM

Questions builders ask

What does construction estimating software do?

It measures what a job needs, prices those quantities against material and labour costs, and turns the result into a proposal the customer can accept. Most tools measure from uploaded plans. Leads2Build measures from a 3D model you draw, so a post-frame quote doesn't wait for a drawing set.

What is the best construction estimating software for a post-frame builder?

The one that measures what you build. If you bid many trades from architect drawings, a plan-takeoff tool fits. If most of your quotes are shops, pole barns and barndominiums sized on a phone call, look for software that works out posts, trusses, girts, purlins and steel from the building's geometry and prices them from your yard.

Can ChatGPT do construction estimates?

It can explain estimating, draft a scope or tidy up proposal wording. It can't count the girts on your 40x60 at your spacing or know what your yard charges this week. An estimate needs quantities measured from one specific building and prices from your supplier, so treat a chat-generated number as a guess.

Is a spreadsheet or free estimating software good enough?

For a few quotes a month, a spreadsheet works until the customer changes the building and every quantity has to be re-entered. Free tools exist, and STACK offers a free version, but plan-takeoff tools still need a drawing to measure. The real test is how many steps sit between a changed dimension and a changed price.

What happens to my quotes when lumber prices change?

Edit a cost or sell price once in your price book and every building still being designed reprices, because each drawn part is tied to a real material. A quote already sent keeps the prices it was cut with, so it never shifts under the customer. Re-pricing a sent quote means cutting a new version.

30 minutes with Keith · exclusively post-frame & barndominium

Bring one real job.
We’ll walk it lead to paid.

Keith Lemay, the founder, takes this call himself. You show how a job moves through your business today — the call, the quote, the contract, the build, the money. He shows you the same job in Leads2Build. We work exclusively with post-frame and barndominium builders, so none of it is generic.

  • Pick a time — it goes straight onto Keith’s calendar.
  • The confirmation comes by email, with a link to move it if you need to.
  • Bring a job you’ve quoted lately. That’s the one worth walking through.
Keith LemayFounder, Leads2Build

Keith's next open times

The confirmation comes by email.