Stage templates by building type

Each building type gets its own stage list and dependency map — names, colours, lengths, checkpoints, what waits on what and the weather that stops each stage — editable by your company.

The operating system built exclusively for post-frame and barndominium builders.

Part of The Launch Pad
The short answer

Do post frame construction stage templates need to differ by building type?

Yes. A post-frame shop, a post-frame barndominium and a red-iron barndominium don't share a stage list, so keep post frame construction stage templates per building type: each stage with its name, color, default length and checkpoints, plus a map of what waits on what and the weather that stops it. Starting a job copies the template, links and all, so a barndo starts from a barndo plan.

Why it works
  • Whatever is pre-set is what most people end up with: in organ donation, simply changing the default option had a large effect on how many people became donors. A stage template is a default, so a wrong one, like concrete before dirt work, reaches crews on every job nobody re-checks. Johnson & Goldstein, 2003 ↗
  • A barndominium isn't a shop with a kitchen. Its structure falls under IBC requirements, the garage must be separated from the dwelling, and a wall under 5 ft from the lot line needs a 1-hour rating, so its stages and checkpoints differ from an ag building's. NFBA (Stauffer), 2025 ↗
  • A short standard checklist used at set points cut surgical deaths from 1.5% to 0.8% and complications from 11.0% to 7.0% across eight hospitals. Checks built into the plan get done; checks left to memory get skipped. Haynes et al., 2009 ↗
What it is

One template per building type: Post frame, Barndominium and Non-niche to start with, and you can add your own — blank, or from a linked starter: a post-frame shop, a post-frame barndominium or a red-iron barndominium. Each stage carries a name, a colour, a default length and its checkpoints, and the building type's dependency map says what each stage waits on, the weather that stops it, and the checkpoints that come first. Starting a job copies that template onto it — links and all — so a barndominium starts from a barndominium plan instead of a generic one, with its first dates laid out from the links. We don't build software for plumbers or remodelers — only for builders like you, so the stages are a pole barn's stages: permitting, dirt work, concrete, material delivery, post set, siding and roofing.

Also called: stage presets · post frame stages · barndominium stages · set up my build stages · customise stages · dependency map · schedule template · barndominium schedule · post-frame schedule · red iron barndominium schedule · starter template

See it, piece by piece
01

Post Set, not Framing — the stages are named the way you build

Each building type carries its own stage list, colours, default lengths and checkpoints. The post-frame template renames Framing to Post Set; the barndominium template also renames Concrete to Slab / Foundation. Rename, reorder, add or remove stages, so a shed stops carrying a barndominium's stage list and the board reads in the words your crews already use.

Project Phases
Project phases3 of 6 doneNow: Siding / Roofing1 behindDependency mapManageAdd Phase
Drag the grip on the left of any stage to reorder the build.
Permitting
Jul 27 – Aug 8 • 12 days4/4
Done
Concrete
Aug 8 – Aug 13 • 5 days16/6
Done
Material Delivery
Aug 13 – Aug 17 • 4 days14/4
Done
Post Set
Aug 17 – Aug 26 • 9 days13/6
Active
Siding / Roofing
Aug 26 – Sep 3 • 8 days10/11
Planned
Final Payment
Sep 3 – Sep 6 • 3 days10/5
Planned
The Hostetler shed's phases — Post Set where a generic tool would say Framing. Real screen · sample data.
Without it

The board says Framing, the crew says Post Set, and the new hire spends his first week translating between them.

Why we built it

Crews talk about post set, not framing, and a board in their own words is one they actually read. Each building type carries its own list, so a shed stops dragging a barndominium's stages behind it and a new hire learns the job in the words the crew already uses.

02

The default order is the order you actually build in

You grade, fill and compact the pad, then you form and pour on it. The factory templates were corrected to say so; the earlier order put concrete first, which is backwards on every real site. It matters because the template is what every new job is copied from, and a wrong default gets copied by whoever starts a job in a hurry.

Without it

A new job copies a plan with the slab poured before the pad is graded, and the one nobody catches goes out to the crew that way.

Why we built it

Whoever starts a job in a hurry takes the default as it comes, so the default has to be right. Grading before pouring is how every real site runs, and getting the template right once means no job goes out to a crew backwards.

Sound familiar?“my stages aren't the same as everyone else's”
03

A dependency map for each building type

Try it

Switch Project Stages to Map and the building type draws itself top to bottom: every stage a box, every arrow running from the stage that comes first to the one that waits on it, stages that run together side by side. A tag on an arrow is its rule — SS starts together, FF finishes together, +7 cal is seven calendar days of wait. Pick a stage to set what it waits on, the weather that stops it, and the checkpoints that come first. Every job started from the building type copies the map; a job's own copy can then be changed in its project window without touching the template.

Project Stages — Post-frame barndominium, dependency map
Slab pour2 days
Waits on
Under-slab plumbing & prep
Starts when Under-slab plumbing & prep is finished
13 stages aren't offered — they wait on this one, so it would go round in a circle.
Weather that stops it
Checkpoints that must be ticked before it starts
Under-slab plumbing & prep › Underground plumbing inspection passed
The post-frame barndominium starter on the map; pick a stage to read its links. Real screen · sample data.
Without it

Only the owner knew that the under-slab inspection holds the pour, so every job he wasn't on went in the wrong order.

Why we built it

The order a barndo goes up in is written down once, on the building type, instead of rebuilt in the PM's head on every job — and a new PM can read it.

Sound familiar?“a shed doesn't have the same stages as a barndominium”
04

Start from a linked starter

+ New Building Type can start from one of three starters, already linked: a post-frame shop, where the slab is poured inside once the roof is on and the skirt board is the form; a post-frame barndominium, dried in first, then under-slab plumbing, its inspection, the pour and the interior to the certificate of occupancy; and a red-iron barndominium, slab first with the steel erected 7 calendar days after the pour at the earliest — longer in cold weather, and confirmed with your engineer. The order, links, cure and fabrication waits, inspections and weather are set from published industry sources; the durations are starting points for your own crew's numbers. An account that also builds barndominiums with its own trades gets a fourth, Barndominium — full trades, where every stage names the trade that does it and the equipment it needs on site. Your existing building types aren't touched.

Without it

A shop builder's first barndo poured the slab before the under-slab plumbing had been inspected.

Why we built it

A builder new to barndos gets a plan that already knows the slab has to wait for its inspection and the countertops for their template, and edits it rather than discovering it on a job.

05

The weather that stops each stage

Each stage on the building type lists the weather it can't work through — rain and frozen ground for dirt work, wind and lightning for trusses and steel, cold and heat for a pour, nothing for drywall under a roof — and, after rain, the dry-out days the ground needs. A building type that already exists can Suggest the weather that stops each stage from the stage names, for you to correct. That list is what a weather day reads.

Without it

A rained-out day pushed the whole job, interior trades included, because nothing knew which stages the rain actually stopped.

Why we built it

A rain day is logged once, and the schedule already knows which stages it stops — because the builder said so once, on the building type.

Sound familiar?“I want to rename Framing to Post Set”
06

Renaming a stage doesn't silently break what's attached to it

Every stage keeps its own lasting identity behind the display name, so a notification rule or an email template stays attached through a rename. Before that existed, a renamed stage kept its old name underneath and a newly added stage had no identity at all — so it could never carry a rule in the first place.

Without it

Renaming Framing to Post Set quietly cuts off the framing-finished email, and nobody notices until a customer asks why the updates stopped.

Why we built it

An owner who renames a stage should not silently lose the customer email that hangs off it. Every stage keeps a lasting identity behind its name, so notification rules and templates follow it through a rename — and a stage you add yourself can carry them from day one.

Sound familiar?“the default stage order is wrong for how I build”
07

Write down what "ready for inspection" means once

Stages and checkpoints carry written explanations any crew member can read from the item itself, so the standard travels with the checkbox instead of living in the explanation you gave a new hire in the truck. Correct the wording and it reaches jobs already running, the same day. New men can answer their own question without calling the office.

Without it

Every new hire learns a different version of "done" from whoever trained him in the truck.

Why we built it

New men don't want to call the office to ask what "ready for inspection" means. Writing the standard on the checkpoint itself answers it on site, the same way for every crew — and a correction reaches jobs already running the same day.

08

Twelve stage colours chosen so two bars are never confusable

Stage colour is data, not decoration — it is how you read the board from the far side of the office. Colours come from a fixed set, and a stage you added yourself keeps its own colour instead of falling back to grey. Where two same-status stages run back to back, the board shades them slightly apart so they don't merge into one block.

Build Schedule
Project / Task
Hostetler Equipment ShedCrew A
Zimmerman Horse BarnCrew B
PermittingAug 4 – Aug 18
Dirt WorkAug 18 – Aug 22
ConcreteAug 22 – Aug 28
Material DeliveryAug 28 – Sep 1
Post SetSep 1 – Sep 11
Stoltzfus ShopCrew C
Byler BarndominiumCrew A
Jul 27– Aug 2
Aug 3– Aug 9
Aug 10– Aug 16
Aug 17– Aug 23
Aug 24– Aug 30
Aug 31– Sep 6
Sep 7– Sep 13
Sep 14– Sep 20
Sep 21– Sep 27
Sep 28– Oct 4
Oct 5– Oct 11
Oct 12– Oct 18
Oct 19– Oct 25
Oct 26– Nov 1
TODAY
Permitting 4/4
Post Set 3/6
Siding / Roofing 0/11
46% • 38d
Permitting+3d
Concrete
Post Set0/6
Permitting 1/4
Framing 0/6
Siding / Roofing 0/11
Permitting 0/4
Slab / Foundation 0/6
Post Set 0/6
Siding / Roofing 0/11
Shutdown week — Crew B
OVERLAP
Permitting gold, dirt work brown, concrete slate, material delivery blue, post set orange — one colour per stage, on every bar. Real screen · sample data.
Without it

Two stages in near-identical blues merge into one block, and the office misreads which jobs are pouring this week.

Why we built it

The owner reads the board from the far side of the office, so colour has to carry meaning. A fixed set chosen so no two stages are confusable — and a stage you add keeping its own colour instead of grey — means one look says where every job is.

How it works
  1. 1Open Settings → Project Stages and pick a building type — or + New Building Type from a linked starter.
  2. 2Rename, reorder, add or remove stages so they read the way you build.
  3. 3Give each stage a colour and a default length.
  4. 4Add the checkpoints that belong inside it — and which ones must be ticked first.
  5. 5Switch to Map to set what each stage waits on and the weather that stops it.
  6. 6Starting a job copies that list and its map onto the job.
Why we built it

The default stage order put concrete before dirt work, which is backwards on every real site — you cannot pour a slab and then grade the pad underneath it. Every new job started from a plan the builder had to reorder by hand, and the ones nobody caught went out to crews wrong. Underneath it was worse: a renamed stage kept its old name and a newly added stage had no identity at all, so it could never carry a notification rule or an email template.

The problem
  • One rigid stage list for every kind of building
  • Stage names that don't match how a crew talks
  • Renamed stages silently losing their notification rules
What you get
Each building type carries its own realistic stage plan
Stage names match site language
Renames never orphan the automation bound to a stage
Starts from the stages a pole barn actually has, not a generic project template
What's inside
Stage colours you can read across a room

Twelve named colours — Amber, Slate Blue, Brown, Blue, Orange, Purple, Green, Teal, Red, Pink, Indigo, Charcoal. Stage colour is data, not decoration: it is how you read the board from the far side of the office. A stage you added yourself keeps its own colour instead of falling back to grey.

What this stage, and this checkbox, actually means

Write down what dirtwork actually includes, or what "ready for inspection" means, in your own words. It shows as a tip beside the stage title and beside each checkpoint. Unlike the labels, a correction reaches jobs already in progress the same day.

PROJECT STAGES

See stage templates by building type
on one of your own jobs.

Thirty minutes with Keith — your building, your numbers. Bring the job where “my stages aren't the same as everyone else's” — we will show you exactly where that stops.