Change orders

Price a mid-job scope change, get it signed, and turn it into money — with the days it adds and the reason for it on the record.

The operating system built exclusively for post-frame and barndominium builders.

Part of The Money Trail
The short answer

What should post frame change order software do?

Post frame change order software should price the change, record who asked for it and why, show the days it adds, and get the customer's signature before the crew builds the lean-to or moves the door. Our change orders are numbered per job with one of seven reasons, signed from a phone, frozen once approved, and folded into an invoice or billed on their own.

Why it works
  • A handshake becomes two different memories. People judge the outcome that favors them as the right one, and Babcock and Loewenstein found this self-serving bias is a main cause of deadlock in negotiations. Six weeks after a truck-window yes, builder and customer each remember the version that suits them. Babcock & Loewenstein, 1997 ↗
  • In some states the signature is the whole case. Under California's home-improvement law, a change order is part of the contract only if it is written and signed before the changed work starts. Other states vary. California B&P Code §7159 ↗
  • Schedule pressure is why the paperwork gets skipped. A construction attorney writes that approvals are often verbal and crews go ahead without written sign-off because of field and schedule pressure. Construction Dive, 2023 ↗
  • Owner-directed changes ranked the number three cause of construction disputes in North America in 2024. This is large-project data, so treat it as direction, not a post-frame figure. Arcadis, 2025 ↗
What it is

A numbered change order per job, carrying a description, one of seven reasons, the days it adds to the schedule, its lines, markup, tax and total. It moves draft, awaiting customer, approved, invoiced, paid — partially signed in between when the suppliers on it each sign their own block — or it is declined or cancelled. Once approved, the signature is frozen: any further scope takes a new change order. Each line can carry your cost and its own markup, so an approved change moves the job's budget as well as its price — and it's built exclusively for post-frame and barndominium builders, so the reasons on the list are the ones that come up on a pole barn or a barndo.

Also called: extras · change order · customer wants to add something · scope change · CO

See it, piece by piece
01

Extras get priced, agreed and dated before the work starts

Each one is numbered against the job and carries a description, one of seven reasons, and the days it adds to the schedule, along with its lines, markup, tax and total. It moves draft, sent, approved — and once approved the signature is frozen, so further scope takes a new change order. A carbon pad in the truck records the work. This records the agreement.

New Change Order — Line Items
Line Items+ Add Line
Kind
Material
Description
12×12 insulated overhead doors
Supplier
Kaufman Door Supply
Qty
2
Unit
ea
Your cost / unit
2,150.00
Markup %
15
Unit Price
2,472.50
Total
$4,945.00
Kind
Labor
Description
Frame openings, headers, jamb & track install
Supplier
Unassigned
Qty
18
Unit
hr
Your cost / unit
52.00
Markup %
30
Unit Price
67.60
Total
$1,216.80
Kind
Credit (subtracts)
Description
Delete one 3068 walk door from base scope
Supplier
Unassigned
Qty
1
Unit
ea
Your cost / unit
optional
Markup %
0
Unit Price
640.00
Total
-$640.00
Markup %
0
Tax %
6
Subtotal$5,521.80
Markup (0%) + Tax (6%)$331.31
Total$5,853.11
Schedule+3 days
The Kind and Supplier columns, the markup and tax roll-up, and the schedule impact in days. Real screen · sample data.
Without it

The extra footing is agreed through a truck window on a Tuesday, and the only record of it is a figure in somebody's head that has grown by March.

Why we built it

The editor will not save without a title and at least one line that has a description and a quantity above zero. That is deliberate friction at the exact moment the customer is standing there wanting a number — because a change order reading "extra concrete, $2,400" is not evidence of anything six months later, and the extra thirty seconds is the whole difference.

02

The argument at the end of a job is rarely about the amount

Every change order picks one of seven fixed reasons — customer request, code required, site condition, error correction, scope addition, scope reduction, other. The reason prints on the document with the chosen one ticked, beside the six that were not.

Change order agreement
Leads2Build
Ridgeline Post-Frame LLC

CHANGE ORDER AGREEMENT

Project Name:
40×64 Shop — Buck Hollow Road
Project Address:
1284 Buck Hollow Road, Quarryville, PA 17566
Owner/Client Name:
Marlene R. Zook
Original Contract Date:
June 11, 2026
Change Order #:
2
Date Issued:
August 24, 2026

1. Description of Change

Site condition: additional fill and compaction

Excavation exposed soft soil across the north half of the pad. Adds 96 tons of 2A modified, placed and compacted in lifts, plus a second proof-roll before forms are set.

2. Reason for Change

  • Customer Request
  • Code Required
  • Site Condition
  • Error Correction
  • Scope Addition
  • Scope Reduction
  • Other

3. Cost Adjustment

DescriptionQtyRateAmount
2A modified stone, delivered · ton96$28.50$2,736.00
Place and compact in 8" lifts · hr9$82.00$738.00
Original Contract Price:$61,420.00
ADD: $3,460.00
DEDUCT:
New Contract Total:$64,880.00
Payment Terms for This Change:
Added to the existing project payment schedule

4. Schedule Adjustment

No change to completion date
Contract time will be extended by: 4 days

5. Agreement

This Change Order modifies the original contract between the parties listed above. All other terms and conditions of the original agreement remain in full force and effect.

Work related to this change will not begin until this Change Order is signed by all parties.

6. Signatures

Owner / Client
Marlene R. Zook
Marlene R. Zook
Signed August 24, 2026
Ridgeline Post-Frame LLC Representative
Ridgeline Post-Frame LLC
Issued and authorized August 24, 2026
Ridgeline Post-Frame LLC · Change Order CO-002Approved
Section 2 — the seven reasons, with the one that applies ticked. Real screen · sample data.
Without it

Six months on, the customer remembers the extra fill as your excavation mistake and you remember it as soft soil nobody could have seen, and neither of you wrote a word down that morning.

Why we built it

A free-text reason box fills up with "per customer" and proves nothing later. A fixed list forces the question that actually gets disputed — who asked for this — to be answered on the day. The trade-off is that seven boxes will never describe every situation, so "other" exists and the description underneath carries the rest.

03

A credit subtracts, and markup and tax always apply in the same order

Every line is material, labour, markup or credit, and a credit is forced negative however the amount was typed — so a customer dropping a door can never be billed as an addition. The subtotal runs through markup first, then tax, in that order, every time. Both directions of a scope change live on one document.

Change order ledger
Change Orders(5)$15,030.00+ New Change Order
CO-1Add two 12×12 overhead doorsPaid
$6,480.00· +3d· Crew ack’d
View
CO-2Site condition: additional fill and compactionPaid
$3,460.00· +4d· Crew ack’d
View
CO-3Upgrade to 26ga standing seam roofInvoiced
$9,240.00· Crew ack’d
View
CO-4Delete rear lean-to (owner deferring)Approved
-$4,150.00· -2d· Crew ack’d
View
CO-5Add 4×8 wainscot on the gable endsAwaiting Customer
$1,885.00· +1d
ViewSign with Customer
CO-4 is a deduct — negative in its row, and in the net at the top. Real screen · sample data.
Without it

The customer drops a walk door, the credit gets typed as a positive number, and the change order that was meant to give $640 back charges them $640 for it.

Why we built it

The sign comes from the line's kind, not from whether somebody remembered the minus key — because "640" and "-640" get typed into the same box by the same person on the same afternoon. Deciding it in the arithmetic instead of the typing means a deduct can only ever reduce the job.

Sound familiar?“customer keeps adding things and I never charge for them”
04

Every line can carry your cost and its own markup

Try it

Each line can carry Your cost / unit and its own Markup %. New lines start at the job's markup — set once on the job's budget & margin card — change the cost or the markup and the unit price follows, or type a price and the markup it implies is worked out. Only people allowed to set line markup see the cost fields. When the change order is approved, its cost moves the job's budget, not just its price.

Change order — your cost and markup per line
Line Items+ Add Line
KindMaterial
DescriptionPorch extension — posts, trusses and steel
SupplierUnassigned
Qty1
Unitea
Your cost / unit
Markup %
Unit Price
Total
$3,600.00
KindLabor
DescriptionFrame and roof the 8 ft extension
SupplierUnassigned
Qty1
Unitea
Your cost / unit
Markup %
Unit Price
Total
$2,516.07
The porch extension — one line with its cost and markup, one priced directly. Real screen · sample data.
Without it

An extra quoted on the spot goes in at cost, because nobody did the markup math in the driveway.

Why we built it

Builders price changes in a hurry, often standing in the customer's driveway. Starting every line at the job's markup means a rushed quote still earns what the job earns — and recording the cost lets the owner see later which extras were worth doing.

05

Your customer signs from a phone — typed name and drawn signature, both

Neither the typed name nor the drawn ink counts on its own, and the acknowledgement has to be ticked. The exact agreement text they were shown is copied into the record, along with the device they signed on — so editing your template later cannot rewrite what was signed. It is the same signing block they used on the construction agreement, and the pad, the tick and what gets stamped with the ink are covered on the contract signing page. Standing in the driveway together? A change order awaiting the customer carries Sign with Customer on its row, which opens the same document for them to sign on your device.

Customer Signature
Customer Signature
Type your full legal name
Marla Zimmerman
Draw your signatureClear
Please initial all 4 sections above (3 of 4 done) before signing.
Sign & Submit Contract
Both are required — the typed legal name and the drawn ink. The button stays dark until each is there. Real screen · sample data.
Without it

You reword your change order clause in April, and every change order signed before it silently shows the new wording — which is exactly what a binding record must never do.

Why we built it

The agreement wording is copied into the signature row at the moment it is written rather than pointed at. It costs a duplicated block of text on every single signature, and it buys the one property a signed record must have: nothing you do to your template next spring can change a word of what this customer agreed to.

Sound familiar?“did extra work on a handshake and never got paid”
06

The name they type has to be their name

Try it

The typed name is checked against the customer on the job — capitals do not matter, spelling does. Type something else and the field turns red and the sign button never lights. Declining takes a written reason, and the reason is recorded on the change order rather than dropped. And it asks every time: there is no dollar line below which a change order skips the signature — a $400 extra outlet goes through the same step as a $40,000 slab, because a built-in threshold would be a guess made on your behalf.

Portal change order sign
6. Signatures
Owner / Client
Type your full legal name
Draw your signature
Sign here
Tick, typed name, drawn ink — the button stays dark until all three are there. Real screen · sample data.
Without it

The lean-to gets signed by the son-in-law who had the phone in his hand, and the person who has to pay for it never saw it.

Why we built it

Matching the name is the cheapest guard there is against a spouse, an office manager or whoever else happens to hold the link signing on the customer's behalf. It costs real friction for the man who goes by Del when the contract says Delmar — accepted, because the alternative is a signature from somebody who was never a party to the agreement.

07

The change order you approve is the exact document your customer signs

Try it

One document serves your screen, your customer's page and the printer: the description, the reason list with the chosen one ticked, the original contract price against the add or deduct and the new total, the schedule change, the agreement clause, and both signature blocks. Once it is signed it files itself beside the original agreement on their live project page. A change order is a contract amendment. Two versions of it means two versions of a binding record, and a dispute you cannot answer cleanly.

Portal change order doc
Ridgeline Post-Frame
CHANGE ORDER AGREEMENT
Project Name:
Zimmerman Equipment Barn
Project Address:
4180 Quarry Bend Rd, Millersburg, PA 17061
Owner/Client Name:
Marla Zimmerman
Original Contract Date:
July 2, 2026
Change Order #:
4
Date Issued:
August 22, 2026
1. Description of Change

Add 12′ lean-to on south elevation

Extend the south eave with a 12′ × 64′ open lean-to on 6×6 posts, matching roof panel and trim. Includes gutter tie-in and grade work along the new drip line.

Attached drawings / documents
lean-to-elevation-r2.pdf
2. Reason for Change
  • Customer Request
  • Code Required
  • Site Condition
  • Error Correction
  • Scope Addition
  • Scope Reduction
  • Other
3. Cost Adjustment
Description
Qty
Rate
Amount
Lean-to framing package · ln ft
64
$96.25
$6,160.00
Roof panel & trim · sq ft
768
$3.62
$2,780.00
Original Contract Price:$128,400.00
ADD: $8,940.00
DEDUCT:
New Contract Total:$137,340.00
Payment Terms for This Change:
Invoiced separately for this change
4. Schedule Adjustment
No change to completion date
Contract time will be extended by: 6 days
5. Agreement

This Change Order modifies the original contract between the parties listed above. All other terms and conditions of the original agreement remain in full force and effect.

Work related to this change will not begin until this Change Order is signed by all parties.

6. Signatures
Owner / Client
Signature · Date
Ridgeline Post-Frame Representative
Ridgeline Post-Frame
Issued and authorized August 22, 2026
Ridgeline Post-Frame · Change Order CO-004Awaiting Customer
The customer's copy — rendered by the same component your own screen uses. Real screen · sample data.
Without it

The paperwork you reviewed and the paperwork he signed differ by a line, and in the one conversation where that matters you cannot say which of them is the record.

Why we built it

Your viewer used to draw its own layout while the portal drew another — same change order, two different documents depending which screen you opened. Both now mount the same component, so a wording change cannot land on one side and miss the other. The cost is that your internal screen shows the customer's document rather than a denser builder's one.

08

The crew lead's sign-off on new scope is on the change order, not in an inbox

An approved change order is not finished when the office files it. The crew lead's acknowledgement is recorded against that change order — who, and when — and reads back on the row beside the money as Crew ack'd. Taking the job on in the first place is a separate document the lead puts his name to before a shovel moves; that one is the crew acceptance contract.

Project details
Client PortalLink EstimateArchiveDelete
26-HOSTETLER-014Hostetler Equipment Shed
Post-FrameCrews:Crew Aall 4 acceptedConcrete Crew 1 of 2 accepted+ Add crewDale HostetlerProperty
1840 Meetinghouse Rd, Gap, PA 17527
The job screen the change order lives on — beside the stages, the crew and the money. Real screen · sample data.
Without it

The signed amendment sits in the office while the building goes up to the pre-change drawing, and the doors get framed in the wall the customer paid to move them off.

Why we built it

The acknowledgement is stored on the change order rather than counted as read on a message, because a message has no owner and no timestamp you would want to rely on. Keeping it beside the total means the one glance that answers "is this billed" also answers "does the crew know".

Sound familiar?“customer says they never agreed to the extra”
09

Approve one and the job is worth a different number everywhere

An approved change order stacks on top of the signed contract figure, not the estimate, and the new sum re-lands on the pipeline card, the job screen and the one customer total every other screen reads. A row you deliberately keep off the contract value stays off it everywhere.

Lead card
Emma Carter$385,000
Barndo$385kFacebook ad
1/6
Confirm
CallTextEmail
Sep 15Daniel Hayes1d 3h 22m
The card's project value — signed contract plus approved change orders. Real screen · sample data.
Without it

The signed contract reads $34,016.87, the estimate has drifted to $37,828.19, and two approved change orders worth $3,159.48 appear in neither — so four screens quote four prices for one job.

Why we built it

The base is read out of the frozen text of the executed contract rather than a stored number, because a column can be updated without anybody re-signing anything. Change orders are then the only instrument allowed to move it — which is what makes the total both current and agreed, the two things you need before you invoice.

10

Their project total moves with every approved change

The Project Total at the top of the customer's page is the estimate plus every approved change order, with the approved changes named underneath — so the number they read first already includes what they agreed to.

Project Total — with approved changes
Project Total
$428,150.00
incl. $8,150.00 in approved changes
Status
Rough-ins
Approved On
July 14, 2026
Milestones
37 / 62
$428,150.00 — incl. $8,150.00 in approved changes. Real screen · sample data.
Without it

The customer's page still showed the original price after three approved change orders, so the final invoice felt like an ambush.

Why we built it

Nobody likes a surprise bill, even for something they asked for. When the first number the customer sees already includes the change, the invoice confirms what they expected — and the relationship survives the job.

Sound familiar?“change orders live on a paper pad in the truck”
11

A customer's selection becomes a change order on its own

When a customer chooses an option against an allowance on their project page and you approve it, the overage or credit becomes a change order by itself — approved if they chose it with the price on screen, a draft to sign if you recorded it for them. If the product they picked is later discontinued — or swapped when it's bought because the lead time is too long — the replacement never moves an approved pick's change order: when the price should change, you write a new one. How the choosing works is on selections and allowances.

Approve a selection

Approve Flooring — main living area

Shaw Floorte LVP, Pacific Oak — $1,600 over the allowance.

The customer chose this in their portal with the price shown, so the overage goes on the contract as an approved change order.

Cancel
Approving the flooring pick writes an approved change order for $1,600. Real screen · sample data.
Without it

The upgrade was approved, the change order was never written, and the overage was never billed.

Why we built it

The change order nobody had to write is the one that never gets forgotten. Turning an approved pick into the paperwork keeps the contract matching the house, with no extra job for the office.

12

Sending it locks the scope, and somebody has to chase it

Once it is sent the lines can no longer be edited. The billing plan still can, right up until it is actually billed. Every row carries a reminder button, so a change order sitting at Awaiting Customer becomes a dated task with a name on it instead of something you meant to ring about.

New task — reminder
Estimate sent
New task
Marla Zimmerman — 40×64 equipment barn
Due date
Sep 12, 2026 at 9:00 AM
Reminder
At the due time30 min before1 hour before24 hours before
or2.5hoursbefore it’s due
Due: Sat, Sep 12, 9:00 AM
Reminder: Sat, Sep 12, 8:00 AM — 1 hour before
Task
Call to walk it throughAsk about the door packageChase for a decision
Call to walk it through
Notes (optional)
What future-you needs to know…
Assign to
Sheila Nunez — Sales
Priority
High
Repeat
Doesn’t repeat
Remind via
In-appEmailTextPush
They’ll get a notification that you assigned this to them, with the details.
Assign taskCancelDue Sat, Sep 12, 9:00 AM
The reminder that comes off the change order row, already named after it. Real screen · sample data.
Without it

It sits at Awaiting Customer for three weeks, the doors get ordered anyway, and nobody notices it was never signed until the invoice comes back disputed.

Why we built it

Scope locks at send and billing does not, because the two are decided by different people at different moments — the customer is agreeing to the work and the price, and how it gets invoiced is your side of the job. Locking both would mean re-sending a signed document to change an invoice date.

13

It is on their page the moment you send it

Sending files the change order into the customer's documents and puts it on the project link they already have — no new login, nothing to download. What it looks like from their end — every change order listed, where each one stands, and what they have added to the job so far — is change orders on the customer's page.

Portal change orders card
Change Orders (4)
1 awaiting your review
CO-004Pending
Add 12′ lean-to on south elevation
$8,940.00 · +6 days · Aug 22
CO-003Approved
Upgrade to 26-gauge standing seam
$4,310.00 · +3 days · Aug 08
CO-002Approved
Roof pitch reduced 10:12 → 8:12
-$740.52 · Jul 29
CO-001Invoiced
Relocate service door to east wall
$380.00 · Jul 15
Their card — the pending one first, each with what it added and the days it cost. Real screen · sample data.
Without it

The change order reads Sent in your software and is sitting in a spam folder, and the first the customer hears of an $8,940 lean-to is an invoice for it.

Why we built it

The send flips the status first and attaches the document second, and the attachment is allowed to fail without failing the send. The change order's own status is the record; the tile in their documents is a convenience, and a convenience must never be able to block the thing it is convenient for.

Sound familiar?“no record of why the job took longer”
14

Signed is not paid

An approved change order shows up in the invoice builder as a line you tick — either one line per change order, or expanded out into its items. Once it is signed you still have to decide how it gets paid for — its own invoice, its own payment plan, or folded into the draws you already agreed — and that choice is laid out in full on the three delivery modes.

New Invoice — Line Items
Line Items?+ Add Line
Project Estimate
Materials — Post-Frame Package
40×64×14 shop: posts, trusses, purlins, 29ga steel, trim package.
Quantity
1
ea
Unit
EachHoursqft…
Unit Price
$
41,850.00
/ea
Total
$41,850.00
Change Order
CO-3 — Add two 12×12 overhead doors
Openings framed, headers upsized, jambs and track included.
Quantity
1
ea
Unit
EachHoursqft…
Unit Price
$
5,853.11
/ea
Total
$5,853.11
Subtotal$47,703.11
Tax (6%)$2,511.00
Total$50,214.11
CO-3, folded into the invoice as its own line. Real screen · sample data.
Without it

The extra is signed in November, gets folded into no invoice at all, and turns up in a year-end reconciliation as work you did for nothing.

Why we built it

Approval and billing are kept as two separate acts, because the moment the customer agrees to the work is rarely the moment you want to ask for the money. Keeping them apart means an approved change order can sit unbilled without being lost — it stays in the pending list until somebody folds it in, and it is refused a second time once it has been.

15

It reads Paid only when the money is actually in

Try it

A change order rolls to Paid when every invoice it produced has cleared, not when it was billed. So the list of extras doubles as the collection tracker for extras — a job otherwise done by hand against the invoice list.

Invoicing — one project's invoices
1INV-2026-0039Drawings & permit deposit — 40×64 ShopDraftIssued Jun 18, 2026$1,500.00⋯
2INV-2026-0040Down (30%) — 40×64 ShopDraftIssued Jun 18, 2026 · Due Jul 3, 2026$25,728.00⋯
3INV-2026-0042Delivery (60%) — 40×64 ShopDraftIssued Jun 18, 2026 · Due Sep 8, 2026$51,456.00⋯
4INV-2026-0044Final (10%) — 40×64 ShopDraftIssued Jun 18, 2026 · Due Oct 2, 2026$8,576.00⋯
Entered and exited clear themselves after three seconds.
One project's invoices — including the ones a change order created. Real screen · sample data.
Without it

Three change orders read Invoiced, two of them were paid in December, and working out which is an evening with the bank statement and the invoice list side by side.

Why we built it

The status is computed back from the invoices rather than stamped at billing time, so a part payment cannot flatter it. A change order split across three buckets keeps reading Invoiced until the last of the three settles, which is the honest answer even though it is the slower-looking one.

How it works
  1. 1Price the change — material, labour, markup, or a credit.
  2. 2Pick the reason, and the days it adds to the schedule.
  3. 3Send it, and it lands in your customer's documents.
  4. 4They sign from a phone, or decline with a reason.
  5. 5Once approved, fold it into an invoice or bill it on its own.
Why we built it

Scope changes get agreed in a truck window and remembered differently by both parties six weeks later. And the argument at the end of a job is rarely about the amount — it is about who asked for it. So every change order carries a reason off a fixed list: customer request, code required, site condition, error correction, scope addition, scope reduction, or other. Once one is approved its signature is frozen, and any further change is a new change order — the same way an amendment works on paper.

The problem
  • Extras performed on a verbal agreement and never billed.
  • Disputes over whether a change was authorised.
  • Schedule slippage with no documented cause.
What you get
Every scope change is priced, agreed and signed before work starts.
The days impact is recorded alongside the money.
Approved change orders flow straight into billing.
One system for the whole post-frame job — the change order, the days it adds, the invoice and the budget in one place.
What's inside
Change Order Agreement — a real contract for extra work

A branded document with your logo, the project, the owner, the original contract date and a change order number, then six numbered sections: description, reason, cost adjustment, schedule adjustment, the agreement clause and signatures. The same document renders in the customer's portal, in your preview and in print.

Material, labour, markup and credit lines

A credit is forced negative however the amount was typed, so a scope reduction always reduces the total. The subtotal then runs through markup first, then tax, in that order, to reach the figure your customer sees.

The Change Order Agreement document

It reads like the paper Change Order Agreement, but nothing is typed twice: your logo, the job, the owner, the description, the reason ticked off a list, the original price against the add or deduct and the new total, the days added, the clause, and both signature blocks. It looks the same on your screen, on your customer's page, and on the printer.

Typed name plus drawn signature

Both are required. Neither the typed name nor the drawn ink counts on its own, and the acknowledgement has to be ticked. The wording they were shown is copied into the record, so editing your template later cannot change what was signed. When and where they signed is captured with it.

A separate signature for each supplier's part

Tag lines with the supplier they belong to, and your customer's page breaks the work out by supplier, each with its own subtotal and its own signature. Until every part is signed it sits at Partially Signed. A change order with no suppliers tagged behaves exactly as before — one block, one signature.

Signing threshold for small changes

One number for your business. At or above it, a signature is required. Below it, none. A change order landing exactly on the number counts as needing one, because that is the figure somebody will inevitably type.

Declines and withdrawals, with reasons

Two endings short of approval. Decline is your customer's act, with their reason on it. Withdrawal is yours, with yours. Both keep their number and stay on the list, each with its own status.

The crew has to acknowledge the new scope

A gate between the office and the site. The change order's own status is untouched. But the crew lead's acknowledgement is required before further stages can be signed off — so a scope change cannot be approved in the office and missed on site.

Supplier purchase orders from a signed change order

On approval, the change order's lines are grouped by supplier, and each supplier gets its own order. Lines with no supplier on them are left out — they are covered by the overall signature, but there is nobody to send an order to.

CHANGE ORDERS

See change orders
on one of your own jobs.

Thirty minutes with Keith — your building, your numbers. Bring the job where “customer keeps adding things and I never charge for them” — we will show you exactly where that stops.

leads2build.com